Home Programs Vapor Recovery Test and Notification Forms
Vapor Recovery Test and Notification Forms | Print |  E-mail

Forms are in Word and Adobe Acrobat PDF formats.  If you do not have Word 2007 or later, please print out forms available in PDF.
 

 TEST NOTIFICATION FORMS

TEST NOTIFICATION SCHEDULE FORM

This transmittal is to be faxed to the District prior to conducting the required tests.

Word

PDF

10 DAY TRANSMITTAL OF VAPOR RECOVERY TEST

This transmittal is to be faxed to the District along with the full test report on District-specified report form within 10 days of completion of testing.

Word

PDF

24 HOUR NOTIFICATION OF TEST FAILURE

This transmittal is to be faxed to the District along with the full test report on District-specified report form within 10 days of completion of testing.

Word

PDF

 

 PHASE I TEST DATA FORMS

 TP 201.3 Static Pressure Performance 

Word

PDF

 TP 201.1B Static Torque of Rotatable Phase 1 Adaptors

Word

PDF

 TP 201.1C/D Leak Rate of Drop Tube/Drain Pressure Integrity/OPD

Word

PDF

 

 HEALY EVR PHASE II TEST DATA FORMS - (E.O. VR-201-XX/VR-202-XX)

 TP 201.4 Dynamic Back Pressure

Word

PDF

 Exhibit 4 - Determination of Static Pressure Performance of the Healy Clean Air Separator

Word

PDF

 Exhibit 5 - Vapor to Liquid Volume Ratio for Healy Phase II EVR Systems (Roots Meter Option)

Word

PDF

 Exhibit 5 - Vapor to Liquid Volume Ratio for Healy Phase II EVR Systems (TriTester Option)

Word

PDF

 Exhibit 8 -  Static Pressure Performance 

Word

PDF

 Exhibit 9 - Veeder-Root ISD Operability Test Procedure

Word

PDF

 Exhibit 10 - INCON ISD Operability Test Procedure

Word

PDF

 VP-1000 Vacuum Pump Tightness Test per IOM

Word

PDF

 

 VST Membrane/Veeder-Root Vapor Polisher PHASE II TEST DATA FORMS - (E.O.VR-203-XX/VR-204-XX)

 Exhibit 4 -  Static Pressure Performance 

Word

PDF

 Exhibit 5, Option 2 - Liquid Removal Test

Word

 PDF

 Exhibit 6 - VST Hydrocarbon Verification

Word

PDF

 Exhibit 8 - Vapor Pressure Sensor Verification

Word

PDF

 Exhibit 9 - VST Processor Activation

Word

PDF

 Exhibit 10 - Nozzle Bag Test

Word

PDF

 Exhibit 11 - Veeder-Root Vapor Polisher Operability Test

Word

PDF

 Exhibit 12 - Veeder-Root Hydrocarbon Emissions Verification Test

Word

PDF

 Exhibit 13 - ISD Operability Test

Word

PDF

 Exhibit 14 - Dynamic Back Pressure

Word

PDF

 

 VST w/ HIRT VCS 100 PHASE II TEST DATA FORMS - (E.O.VR-205-XX)

 Exhibit 4 -  Static Pressure Performance 

Word

PDF

 Exhibit 5, Option 2 - Liquid Removal Test

Word

 

 Exhibit 6 - Dynamic Back Pressure

Word

PDF

 Exhibit 8 - Hirt VCS Processor

Word

PDF

 

 HIRT MODEL VCS-200 PHASE II TEST DATA FORMS - (EO G-70-139)

 Exhibit 2 -  Static Pressure Performance 

Word

PDF

 Exhibit 2 -  Pilot Light & Main Burner  

Word

PDF

 

 HEALY EXECUTIVE ORDER PHASE II TEST DATA FORMS - (EO G-70-187)

 Exhibit 4 - Healy EO#G-70-187, Vapor Return Line Vacuum Integrity Test

Word

PDF

 Exhibit 5 - Healy EO#G-70-187, Fillneck Vapor Pressure Regulation Test

Word

PDF

 

 PRE-EVR PHASE II TEST DATA FORMS 

 TP 201.5 (Roots Meter Option)

Word

PDF

  TP 201.5 (Roots Meter Option Supplemental)

Word

PDF

  TP 201.5 ( TriTester Option)

Word

PDF

  TP 201.6C Compliance Determination of Liquid Removal Test Option 2 (Long Version)

Word

PDF

 

 
Content View Hits : 148549