|
Vapor Recovery Test and Notification Forms |
| Print | |
E-mail |
|
Forms are in Word and Adobe Acrobat PDF formats. If you do not have Word 2007 or later, please print out forms available in PDF.
|
TEST NOTIFICATION FORMS
|
|
TEST NOTIFICATION SCHEDULE FORM This transmittal is to be faxed to the District prior to conducting the required tests.
|
Word
|
PDF
|
|
10 DAY TRANSMITTAL OF VAPOR RECOVERY TEST This transmittal is to be faxed to the District along with the full test report on District-specified report form within 10 days of completion of testing.
|
Word
|
PDF
|
|
24 HOUR NOTIFICATION OF TEST FAILURE This transmittal is to be faxed to the District along with the full test report on District-specified report form within 10 days of completion of testing.
|
Word
|
PDF
|
|
PHASE I TEST DATA FORMS
|
|
TP 201.3 Static Pressure Performance
|
Word
|
PDF
|
|
TP 201.1B Static Torque of Rotatable Phase 1 Adaptors
|
Word
|
PDF
|
|
TP 201.1C/D Leak Rate of Drop Tube/Drain Pressure Integrity/OPD
|
Word
|
PDF
|
|
HEALY EVR PHASE II TEST DATA FORMS - (E.O. VR-201-XX/VR-202-XX)
|
|
TP 201.4 Dynamic Back Pressure
|
Word
|
PDF
|
|
Exhibit 4 - Determination of Static Pressure Performance of the Healy Clean Air Separator
|
Word
|
PDF
|
|
Exhibit 5 - Vapor to Liquid Volume Ratio for Healy Phase II EVR Systems (Roots Meter Option)
|
Word
|
PDF
|
|
Exhibit 5 - Vapor to Liquid Volume Ratio for Healy Phase II EVR Systems (TriTester Option)
|
Word
|
PDF
|
|
Exhibit 8 - Static Pressure Performance
|
Word
|
PDF
|
|
Exhibit 9 - Veeder-Root ISD Operability Test Procedure
|
Word
|
PDF
|
|
Exhibit 10 - INCON ISD Operability Test Procedure
|
Word
|
PDF
|
|
VP-1000 Vacuum Pump Tightness Test per IOM
|
Word
|
PDF
|
|
VST Membrane/Veeder-Root Vapor Polisher PHASE II TEST DATA FORMS - (E.O.VR-203-XX/VR-204-XX)
|
|
Exhibit 4 - Static Pressure Performance
|
Word
|
PDF
|
|
Exhibit 5, Option 2 - Liquid Removal Test
|
Word
|
PDF
|
|
Exhibit 6 - VST Hydrocarbon Verification
|
Word
|
PDF
|
|
Exhibit 8 - Vapor Pressure Sensor Verification
|
Word
|
PDF
|
|
Exhibit 9 - VST Processor Activation
|
Word
|
PDF
|
|
Exhibit 10 - Nozzle Bag Test
|
Word
|
PDF
|
|
Exhibit 11 - Veeder-Root Vapor Polisher Operability Test
|
Word
|
PDF
|
|
Exhibit 12 - Veeder-Root Hydrocarbon Emissions Verification Test
|
Word
|
PDF
|
|
Exhibit 13 - ISD Operability Test
|
Word
|
PDF
|
|
Exhibit 14 - Dynamic Back Pressure
|
Word
|
PDF
|
|
VST w/ HIRT VCS 100 PHASE II TEST DATA FORMS - (E.O.VR-205-XX)
|
|
Exhibit 4 - Static Pressure Performance
|
Word
|
PDF
|
|
Exhibit 5, Option 2 - Liquid Removal Test
|
Word
|
|
|
Exhibit 6 - Dynamic Back Pressure
|
Word
|
PDF
|
|
Exhibit 8 - Hirt VCS Processor
|
Word
|
PDF
|
|
HIRT MODEL VCS-200 PHASE II TEST DATA FORMS - (EO G-70-139)
|
|
Exhibit 2 - Static Pressure Performance
|
Word
|
PDF
|
|
Exhibit 2 - Pilot Light & Main Burner
|
Word
|
PDF
|
|
HEALY EXECUTIVE ORDER PHASE II TEST DATA FORMS - (EO G-70-187)
|
|
Exhibit 4 - Healy EO#G-70-187, Vapor Return Line Vacuum Integrity Test
|
Word
|
PDF
|
|
Exhibit 5 - Healy EO#G-70-187, Fillneck Vapor Pressure Regulation Test
|
Word
|
PDF
|
|
PRE-EVR PHASE II TEST DATA FORMS
|
|
TP 201.5 (Roots Meter Option)
|
Word
|
PDF
|
|
TP 201.5 (Roots Meter Option Supplemental)
|
Word
|
PDF
|
|
TP 201.5 ( TriTester Option)
|
Word
|
PDF
|
|
TP 201.6C Compliance Determination of Liquid Removal Test Option 2 (Long Version)
|
Word
|
PDF
|
|