Home Programs Vapor Recovery Inspection Checklist
Vapor Recovery Test and Notification Forms | Print |  E-mail

Forms are in Word and Adobe Acrobat PDF formats.  If you do not have Word 2007 or later, please print out forms available in PDF.

TEST NOTIFICATION FORMS

TEST NOTIFICATION SCHEDULE FORM
This transmittal is to be faxed to the District prior to conducting the required tests.

Word

PDF

10 DAY TRANSMITTAL OF VAPOR RECOVERY TEST
This transmittal is to be faxed to the District along with the full test report on District-specified report form within 10 days of completion of testing.

Word

PDF

24 HOUR NOTIFICATION OF TEST FAILURE
This transmittal is to be faxed to the District along with the full test report on District-specified report form within 10 days of completion of testing.

Word

PDF

PHASE I TEST DATA FORMS

TP 201.3 Static Pressure Performance

Word

PDF

TP 201.1B Static Torque of Rotatable Phase 1 Adaptors

Word

PDF

TP 201.1C/D Leak Rate of Drop Tube/Drain Pressure Integrity/OPD

Word

PDF

HEALY EVR PHASE II TEST DATA FORMS - (E.O. VR-201-XX/VR-202-XX)

TP 201.4 Dynamic Back Pressure

Word

PDF

Exhibit 4 - Determination of Static Pressure Performance of the Healy Clean Air Separator

Word

PDF

Exhibit 5 - Vapor to Liquid Volume Ratio for Healy Phase II EVR Systems (Roots Meter Option)

Word

PDF

Exhibit 5 - Vapor to Liquid Volume Ratio for Healy Phase II EVR Systems (TriTester Option)

Word

PDF

Exhibit 8 -  Static Pressure Performance

Word

PDF

Exhibit 9 - Veeder-Root ISD Operability Test Procedure

Word

PDF

Exhibit 10 - INCON ISD Operability Test Procedure

Word

PDF

VP-1000 Vacuum Pump Tightness Test per IOM

Word

PDF

VST Membrane/Veeder-Root Vapor Polisher PHASE II TEST DATA FORMS - (E.O.VR-203-XX/VR-204-XX)

Exhibit 4 -  Static Pressure Performance

Word

PDF

Exhibit 5, Option 2 - Liquid Removal Test

Word

PDF

Exhibit 6 - VST Hydrocarbon Verification

Word

PDF

Exhibit 8 - Vapor Pressure Sensor Verification

Word

PDF

Exhibit 9 - VST Processor Activation

Word

PDF

Exhibit 10 - Nozzle Bag Test

Word

PDF

Exhibit 11 - Veeder-Root Vapor Polisher Operability Test

Word

PDF

Exhibit 12 - Veeder-Root Hydrocarbon Emissions Verification Test

Word

PDF

Exhibit 13 - ISD Operability Test

Word

PDF

Exhibit 14 - Dynamic Back Pressure

Word

PDF

VST w/ HIRT VCS 100 PHASE II TEST DATA FORMS - (E.O.VR-205-XX)

Exhibit 4 -  Static Pressure Performance

Word

PDF

Exhibit 5, Option 2 - Liquid Removal Test

Word


Exhibit 6 - Dynamic Back Pressure

Word

PDF

Exhibit 8 - Hirt VCS Processor

Word

PDF

HIRT MODEL VCS-200 PHASE II TEST DATA FORMS - (EO G-70-139)

Exhibit 2 -  Static Pressure Performance

Word

PDF

Exhibit 2 -  Pilot Light & Main Burner

Word

PDF

HEALY EXECUTIVE ORDER PHASE II TEST DATA FORMS - (EO G-70-187)

Exhibit 4 - Healy EO#G-70-187, Vapor Return Line Vacuum Integrity Test

Word

PDF

Exhibit 5 - Healy EO#G-70-187, Fillneck Vapor Pressure Regulation Test

Word

PDF

PRE-EVR PHASE II TEST DATA FORMS

TP 201.5 (Roots Meter Option)

Word

PDF

TP 201.5 (Roots Meter Option Supplemental)

Word

PDF

TP 201.5 ( TriTester Option)

Word

PDF

TP 201.6C Compliance Determination of Liquid Removal Test Option 2 (Long Version)

Word

PDF

 

 
Content View Hits : 795072